First, the initial stage of the new vehicle has speed requirements, the general provisions is within 40-70 km/h, and require the use of pay attention to the investigation of motor speed tachometer and speed table, so that mixer speed and speed are in the speed of things.
Second, the concrete mixer truck fuel type: new concrete mixer truck oil can not be less than the provisions of the manufacturer's label. Mixer should start after the original temperature, until the water temperature reaches the starting temperature after the recovery step. Driving to select the fine road, to maintain the speed of travel, just to stop the rapid acceleration and brakes, throttle to be small, to manipulate light, but also pay attention to the engine at any time the sound, temperature and so on.
Third, the concrete mixer truck should not be urgently braking: in the running-in period, not the use of emergency braking, so as not to damage the brake system, and increase the load of the brake chassis brake, so the initial 300 km travel do not recycle Urgent braking. If there is a sudden environment, but also should be the first to depress the clutch pedal in order to avoid wear on the mixer brake.
Fourth, new concrete mixer truck full load operation will cause damage to the machine: therefore, in the first 1000 kilometers, the mixer can not be higher than the rated load of 75% to 80%. Mixer new car to run long-range, the engine will continue to increase the time of things, resulting in increased wear and tear parts, so the general environment should not be long driving.
Fifth, the concrete mixer truck when driving to real-time shift: low-block start, 1 km into the future high-block, the traffic in the mixer water temperature should be controlled at 80 ℃ to 90 ℃. Real-time shift in the road, not a long time to use a gear, can not use high-speed low-speed block or use low-speed high-speed block. To each gear from low speed to high speed running for some time, the maximum speed of not more than 5000 rpm is appropriate, the gears have to go to the various speeds, high-speed state can be moderate efforts to force, symmetrical to the brakes Pedal, until down to low speed. It should be noted that the pull after the high-speed oil and machine must be a filter, such as less than a few kilometers have their own money for the oil level is the best level of some of the future to the number of kilometers and then according to the requirements of the concrete mixer truck first time maintenance.
Hubei Changjie Special Purpose Vehicle Co. Ltd
Contact Name: Mr. Suan Yin
E-mail: cj802@urspv.com
Mobile phone: +8613886881673
Tel: +(00)867223229933
Second, the concrete mixer truck fuel type: new concrete mixer truck oil can not be less than the provisions of the manufacturer's label. Mixer should start after the original temperature, until the water temperature reaches the starting temperature after the recovery step. Driving to select the fine road, to maintain the speed of travel, just to stop the rapid acceleration and brakes, throttle to be small, to manipulate light, but also pay attention to the engine at any time the sound, temperature and so on.
Third, the concrete mixer truck should not be urgently braking: in the running-in period, not the use of emergency braking, so as not to damage the brake system, and increase the load of the brake chassis brake, so the initial 300 km travel do not recycle Urgent braking. If there is a sudden environment, but also should be the first to depress the clutch pedal in order to avoid wear on the mixer brake.
Fourth, new concrete mixer truck full load operation will cause damage to the machine: therefore, in the first 1000 kilometers, the mixer can not be higher than the rated load of 75% to 80%. Mixer new car to run long-range, the engine will continue to increase the time of things, resulting in increased wear and tear parts, so the general environment should not be long driving.
Fifth, the concrete mixer truck when driving to real-time shift: low-block start, 1 km into the future high-block, the traffic in the mixer water temperature should be controlled at 80 ℃ to 90 ℃. Real-time shift in the road, not a long time to use a gear, can not use high-speed low-speed block or use low-speed high-speed block. To each gear from low speed to high speed running for some time, the maximum speed of not more than 5000 rpm is appropriate, the gears have to go to the various speeds, high-speed state can be moderate efforts to force, symmetrical to the brakes Pedal, until down to low speed. It should be noted that the pull after the high-speed oil and machine must be a filter, such as less than a few kilometers have their own money for the oil level is the best level of some of the future to the number of kilometers and then according to the requirements of the concrete mixer truck first time maintenance.
Hubei Changjie Special Purpose Vehicle Co. Ltd
Contact Name: Mr. Suan Yin
E-mail: cj802@urspv.com
Mobile phone: +8613886881673
Tel: +(00)867223229933
没有评论:
发表评论